Specification History

SWS Version Created Specification ID Title Specification Objective Supporting Materials Rationale Status
Version 2020 08/14/2020 - 14:28 7.0302.6a Pre-work qualifications

Verify current plumbing infrastructure is sufficient to support the installation(s) and is leak-free

If a roof installation is planned, verify that the roof will support the installation (e.g., dead load, wind load) and that the current roof has more than 10 years of useful life remaining

Verify adequacy of plumbing

Black Line
Version 2020 08/14/2020 - 14:28 7.0302.6a Pre-work qualifications

Verify current plumbing infrastructure is sufficient to support the installation(s) and is leak-free

If a roof installation is planned, verify that the roof will support the installation (e.g., dead load, wind load) and that the current roof has more than 10 years of useful life remaining

Verify adequacy of plumbing

Black Line