Specification History
SWS Version | Created | Specification ID | Title | Specification | Objective | Supporting Materials | Rationale | Status |
---|---|---|---|---|---|---|---|---|
Version 2025 | 10/12/2023 - 15:48 | 0.0401.1g | Insulation – onsite documentation | Post a dated statement signed by the installer that minimally includes: Installed insulation type, coverage area, installed thickness, and installed R-value , basic_html |
Comply with 16 CFR 460.17 and document contract compliance , basic_html |
Red Line | ||
Version 2025 | 10/12/2023 - 15:48 | 0.0401.1g | Insulation – onsite documentation | Post a dated statement signed by the installer that minimally includes: Installed insulation type, coverage area, installed thickness, and installed R-value , basic_html |
Comply with 16 CFR 460.17 and document contract compliance , basic_html |
Red Line | ||
Version 2025 | 10/12/2023 - 15:48 | 0.0401.1g | Finishing wall exterior | After the retrofit wall panels are installed, the exterior surface of the panels must be covered with a weather resistant barrier that is effectively integrated with window, door, and other penetration flashing In cold and wet climates, finished siding should be installed with a vented airspace (rain screen) between the siding and the weather resistant barrier Install finish siding according to manufacturer’s recommendations , basic_html |
Weathertight finishing of wall and penetrations , basic_html |
Red Line |