SWS Version | Created | Specification ID | Title | Specification | Objective | Supporting Materials | Rationale | Status |
---|---|---|---|---|---|---|---|---|
Version 2025 | 10/12/2023 - 16:39 | 0.0501.1l | Inspection | Inspect the installation as required by the AHJ , basic_html |
Third-party verification of installation safety and operation , basic_html |
Red Line | ||
Version 2025 | 10/12/2023 - 16:39 | 0.0501.1l | Inspection | Inspect the installation as required by the AHJ , basic_html |
Third-party verification of installation safety and operation , basic_html |
Red Line | ||
Version 2025 | 10/12/2023 - 16:39 | 0.0501.1m | Testing | Perform electrical tests to verify proper operation and system performance Tests include open circuit voltage, operating current, resistance of grounding system (should be <25 ohms), and resistance of electrical insulation (should be >1 Megohm) Measured voltage shall be compared to reference voltage corrected for temperature Measured current shall be compared to reference current corrected for insolation (sunlight level) , basic_html |
Verify proper operation and system performance , basic_html |