Specification History
SWS Version | Created | Specification ID | Title | Specification | Objective | Rationale | Status |
---|---|---|---|---|---|---|---|
Version 2025 | 05/15/2025 - 12:31 | 0.0501.1l | Inspection | Inspect the installation as required by the AHJ Confirm that as-built PV system is as specified (size and number of PV modules, etc). |
Third-party verification of installation safety and operation |
The committee agrees that aligning all solar specifications is necessary to ensure consistency across installation types. This was done to streamline efforts, and reduce redundancy across both roof-mount and ground-mount solar installations resulting in one set of specifications that align with current standards. Lettering detail ID was modified to align with correct order. | Red Line |
Version 2025 | 10/12/2023 - 16:39 | 0.0501.1l | Inspection | Inspect the installation as required by the AHJ , basic_html |
Third-party verification of installation safety and operation , basic_html |
Red Line | |
Version 2025 | 10/12/2023 - 16:39 | 0.0501.1l | Inspection | Inspect the installation as required by the AHJ , basic_html |
Third-party verification of installation safety and operation , basic_html |
Red Line | |
Version 2025 | 10/12/2023 - 16:39 | 0.0501.1l | Inspection | Inspect the installation as required by the AHJ , basic_html |
Third-party verification of installation safety and operation , basic_html |
Red Line | |
Version 2025 | 10/12/2023 - 16:39 | 0.0501.1m | Testing | Perform electrical tests to verify proper operation and system performance Tests include open circuit voltage, operating current, resistance of grounding system (should be <25 ohms), and resistance of electrical insulation (should be >1 Megohm) Measured voltage shall be compared to reference voltage corrected for temperature Measured current shall be compared to reference current corrected for insolation (sunlight level) , basic_html |
Verify proper operation and system performance , basic_html |
Red Line |