Specification History

SWS Version Created Specification ID Title Specification Objective Rationale Status
Version 2025 05/15/2025 - 12:31 0.0501.1l Inspection

Inspect the installation as required by the AHJ

Confirm that as-built PV system is as specified (size and number of PV modules, etc).

Third-party verification of installation safety and operation

The committee agrees that aligning all solar specifications is necessary to ensure consistency across installation types. This was done to streamline efforts, and reduce redundancy across both roof-mount and ground-mount solar installations resulting in one set of specifications that align with current standards. Lettering detail ID was modified to align with correct order. Red Line
Version 2025 10/12/2023 - 16:39 0.0501.1l Inspection

Inspect the installation as required by the AHJ

, basic_html

Third-party verification of installation safety and operation

, basic_html
Red Line
Version 2025 10/12/2023 - 16:39 0.0501.1l Inspection

Inspect the installation as required by the AHJ

, basic_html

Third-party verification of installation safety and operation

, basic_html
Red Line
Version 2025 10/12/2023 - 16:39 0.0501.1l Inspection

Inspect the installation as required by the AHJ

, basic_html

Third-party verification of installation safety and operation

, basic_html
Red Line
Version 2025 10/12/2023 - 16:39 0.0501.1m Testing 

Perform electrical tests to verify proper operation and system performance

Tests include open circuit voltage, operating current, resistance of grounding system (should be <25 ohms), and resistance of electrical insulation (should be >1 Megohm)

Measured voltage shall be compared to reference voltage corrected for temperature

Measured current shall be compared to reference current corrected for insolation (sunlight level)

, basic_html

Verify proper operation and system performance

, basic_html
Red Line