Version 2020 08/14/2020 - 13:09 2.0202.2c Coverage

Cover all exposed soil

Extend ground vapor retarder a minimum of 6" up all foundation walls and piers, but do not install in contact with non-treated structural wood

, basic_html

Create a continuous ground vapor retarder layer that does not compromise wooden foundation materials

, basic_html
Black Line
Version 2020 08/14/2020 - 13:11 2.0202.2c Coverage

Cover all exposed soil

Extend ground vapor retarder a minimum of 6" up all foundation walls and piers, but do not install in contact with non-treated structural wood

, basic_html

Create a continuous ground vapor retarder layer that does not compromise wooden foundation materials

, basic_html
Black Line
Version 2020 08/14/2020 - 13:09 2.0202.2c Coverage

Cover all exposed soil

Extend ground vapor retarder a minimum of 6" up all foundation walls and piers, but do not install in contact with non-treated structural wood

, basic_html

Create a continuous ground vapor retarder layer that does not compromise wooden foundation materials

, basic_html
Black Line
Version 2020 08/14/2020 - 13:08 2.0202.2c Coverage

Cover all exposed soil

Extend ground vapor retarder a minimum of 6" up all foundation walls and piers, but do not install in contact with non-treated structural wood

, basic_html

Create a continuous ground vapor retarder layer that does not compromise wooden foundation materials

, basic_html
Black Line
Version 2020 08/14/2020 - 13:07 2.0202.2c Coverage

Cover all exposed soil

Extend ground vapor retarder a minimum of 6" up all foundation walls and piers, but do not install in contact with non-treated structural wood

, basic_html

Create a continuous ground vapor retarder layer that does not compromise wooden foundation materials

, basic_html
Black Line
Version 2020 08/14/2020 - 13:06 2.0202.2c Coverage

Cover all exposed soil

Extend ground vapor retarder a minimum of 6" up all foundation walls and piers, but do not install in contact with non-treated structural wood

, basic_html

Create a continuous ground vapor retarder layer that does not compromise wooden foundation materials

, basic_html
Black Line
Version 2020 08/14/2020 - 13:05 2.0202.2c Coverage

Cover all exposed soil

Do not install in contact with non-treated structural wood

, basic_html

Create a continuous ground vapor retarder layer that does not compromise wooden foundation materials

, basic_html
Committee agreed on the proposed verbiage changes. Red Line
Version 2020 08/14/2020 - 13:04 2.0202.2c Coverage

Cover all exposed soil

Extend ground vapor retarder a minimum of 6" up all foundation walls and piers, but do not install in contact with non-treated structural wood

, basic_html

Create a continuous ground vapor retarder layer that does not compromise wooden foundation materials

, basic_html
Black Line
Version 2020 08/14/2020 - 13:03 2.0202.2c Coverage

Cover all exposed soil

Do not install in contact with non-treated structural wood

, basic_html

Create a continuous ground vapor retarder layer that does not compromise wooden foundation materials

, basic_html
Committee agreed on the proposed verbiage changes. Red Line
Version 2020 08/14/2020 - 13:01 2.0202.2c Coverage

Cover all exposed soil

Do not install in contact with non-treated structural wood

, basic_html

Create a continuous ground vapor retarder layer that does not compromise wooden foundation materials

, basic_html
Committee agreed on the proposed verbiage changes. Red Line
Version 2020 08/14/2020 - 13:00 2.0202.2c Coverage

Cover all exposed soil

Do not install in contact with non-treated structural wood

, basic_html

Create a continuous ground vapor retarder layer that does not compromise wooden foundation materials

, basic_html
Committee agreed on the proposed verbiage changes. Red Line
Version 2020 08/14/2020 - 12:59 2.0202.2c Coverage

Cover all exposed soil

Extend ground vapor retarder a minimum of 6" up all foundation walls and piers, but do not install in contact with non-treated structural wood

, basic_html

Create a continuous ground vapor retarder layer that does not compromise wooden foundation materials

, basic_html
Black Line
Version 2020 08/14/2020 - 12:58 2.0202.2c Coverage

Cover all exposed soil

Extend ground vapor retarder a minimum of 6" up all foundation walls and piers, but do not install in contact with non-treated structural wood

, basic_html

Create a continuous ground vapor retarder layer that does not compromise wooden foundation materials

, basic_html
Black Line
Version 2020 08/14/2020 - 12:57 2.0202.2c Coverage

Cover all exposed soil

Extend ground vapor retarder a minimum of 6" up all foundation walls and piers, but do not install in contact with non-treated structural wood

, basic_html

Create a continuous ground vapor retarder layer that does not compromise wooden foundation materials

, basic_html
Black Line
Version 2020 08/14/2020 - 12:56 2.0202.2c Coverage

Cover all exposed soil

Extend ground vapor retarder a minimum of 6" up all foundation walls and piers, but do not install in contact with non-treated structural wood

, basic_html

Create a continuous ground vapor retarder layer that does not compromise wooden foundation materials

, basic_html
Black Line
Version 2020 08/14/2020 - 12:55 2.0202.2c Coverage

Cover all exposed soil

Extend ground vapor retarder a minimum of 6" up all foundation walls and piers, but do not install in contact with non-treated structural wood

, basic_html

Create a continuous ground vapor retarder layer that does not compromise wooden foundation materials

, basic_html
Black Line
Version 2020 08/14/2020 - 12:54 2.0202.2c Coverage

Cover all exposed soil

Do not install in contact with non-treated structural wood

, basic_html

Create a continuous ground vapor retarder layer that does not compromise wooden foundation materials

, basic_html
Committee agreed on the proposed verbiage changes. Red Line
Version 2020 08/14/2020 - 12:53 2.0202.2c Coverage

Cover all exposed soil

Extend ground vapor retarder a minimum of 6" up all foundation walls and piers, but do not install in contact with non-treated structural wood

, basic_html

Create a continuous ground vapor retarder layer that does not compromise wooden foundation materials

, basic_html
Black Line
Version 2020 08/14/2020 - 12:52 2.0202.2c Coverage

Cover all exposed soil

Extend ground vapor retarder a minimum of 6" up all foundation walls and piers, but do not install in contact with non-treated structural wood

, basic_html

Create a continuous ground vapor retarder layer that does not compromise wooden foundation materials

, basic_html
Black Line
Version 2020 08/14/2020 - 12:50 2.0202.2c Coverage

Cover all exposed soil

Extend ground vapor retarder a minimum of 6" up all foundation walls and piers, but do not install in contact with non-treated structural wood

, basic_html

Create a continuous ground vapor retarder layer that does not compromise wooden foundation materials

, basic_html
Black Line