Specification History
SWS Version | Created | Specification ID | Title | Specification | Objective | Rationale | Status |
---|---|---|---|---|---|---|---|
Version 2020 | 08/14/2020 - 13:43 | 2.0202.3d | Seams | Overlap seams a minimum of 12" with reverse or upslope lapping technique For wall to floor connection, install the wall vapor retarder under the ground vapor retarder |
Keep bulk moisture under ground cover |
Black Line | |
Version 2020 | 08/14/2020 - 13:43 | 2.0202.3d | Seams | Overlap seams a minimum of 12" with reverse or upslope lapping technique For wall to floor connection, install the wall vapor retarder under the ground vapor retarder |
Keep bulk moisture under ground cover |
Black Line | |
Version 2020 | 08/14/2020 - 13:42 | 2.0202.3d | Seams | Overlap seams a minimum of 12" with reverse or upslope lapping technique For wall to floor connection, install the wall vapor retarder under the ground vapor retarder |
Keep bulk moisture under ground cover |
Black Line |