Specification History
SWS Version | Created | Specification ID | Title | Specification | Objective | Supporting Materials | Rationale | Status |
---|---|---|---|---|---|---|---|---|
Version 2020 | 08/14/2020 - 14:22 | 3.0104.1a | Pre-work qualifications | Verify that all exterior bulk moisture is directed away from the foundation with appropriate drainage techniques and exterior foundation drainage details are functioning properly (e.g. rain screens, weep holes) |
Prevent bulk moisture intrusion |
Black Line | ||
Version 2020 | 08/14/2020 - 14:22 | 3.0104.1a | Pre-work qualifications | Verify that all exterior bulk moisture is directed away from the foundation with appropriate drainage techniques and exterior foundation drainage details are functioning properly (e.g. rain screens, weep holes) |
Prevent bulk moisture intrusion |
Black Line |