Continuous, contiguous, safe, and compliant thermal barrier
Specifications
- SF
- MH
- MF
Specification | Objective |
---|---|
Verify that installation area is free of: active water leaks, fuel leaks (i.e., gas, oil, propane), and pest intrusions energized or undammed knob and tube wiring uncovered electrical junctions improperly terminated devices (ventilation fans, dryers, plumbing stacks, condensate lines, combustion appliance flues/chimneys, etc.) unshielded high-temperature devices (non-IC rated recessed lights, chimneys, flues, vents, etc.) unless they are zero clearance devices insulation escape openings Verify that installation area: is intact, able to support insulation weight, and air sealed |
Ensure space can be safely insulated |
- SF
- MH
- MF
Specification | Objective |
---|---|
Setup a dust control enclosure for all interior access locations that limits insulation and construction dust exposure to the occupant and occupant belongings |
Prevent occupant exposure to construction dust |
- SF
- MH
- MF
Specification | Objective |
---|---|
Install blown insulation to maximum R-value from attic floor to ceiling to full capacity without dense packing, but without voids |
Complete and consistent insulation coverage |
- SF
- MH
- MF
Specification | Objective |
---|---|
Install closure system over all access holes that is airtight, durable, and aesthetically pleasing |
Airtight, durable, and aesthetic access closure |
- SF
- MH
- MF
Specification | Objective |
---|---|
Post a dated receipt signed by the installer that minimally includes: Installed insulation type, coverage area, installed thickness, minimum settled thickness, installed R-value, and number of bags installed |
Comply with 16 CFR 460.17 and document contract compliance |