Continuous, contiguous, safe, and compliant thermal boundary that prevents air movement @ 50 Pascals
Specifications
- SF
- MH
- MF
Specification | Objective |
---|---|
Verify that installation area is free of: active water leaks, fuel leaks (i.e., gas, oil, propane), and pest intrusions energized knob and tube wiring uncovered electrical junctions improperly terminated devices (ventilation fans, dryers, plumbing stacks, condensate lines, combustion appliance flues/chimneys, supply and/or return air, etc.) unshielded high-temperature devices (non-IC rated recessed lights, chimneys, flues, vents, etc.) unless they are zero clearance devices insulation escape openings Verify that installation area is: intact and able to support insulation weight and pressure |
Prepare for safe, effective, and airtight installation of dense-packed insulation |
- SF
- MH
- MF
Specification | Objective |
---|---|
Install airtight, rigid, blocking material at all cavity openings that aligns with the pressure boundary and will not fail under dense pack pressures |
Airtight dense packed cavity insulation |
- SF
- MH
- MF
Specification | Objective |
---|---|
Install airtight backing material over entire area to be insulated that will withstand dense packing pressures Secure backing material using mechanical fasteners that penetrate the sub-framing a minimum of 1" Installation must have a minimum of a 30-year service life |
Airtight, durable insulation backing |
- SF
- MH
- MF
Specification | Objective |
---|---|
Fill 100% of each cavity with insulation to the correct density that prevents air movement |
Complete, consistent, and airtight insulation coverage |
- SF
- MH
- MF
Specification | Objective |
---|---|
Install closure system over all access holes that is airtight and permanent |
Airtight, durable, access closure |
- SF
- MH
- MF
Specification | Objective |
---|---|
Separate all foam products from occupiable space using a thermal barrier material (e.g., 1/2" gypsum wallboard) as specified by applicable building code If code requirements are unclear, consult local code officials for clarification |
Minimize ignition and combustion potential |
- SF
- MH
- MF
Specification | Objective |
---|---|
Post a dated receipt signed by the installer that minimally includes: Installed insulation type, coverage area, installed thickness, minimum settled thickness, installed R-value, and number of bags installed |
Comply with 16 CFR 460.17 and document contract compliance |