Continuous, contiguous, safe, and compliant thermal boundary that prevents air movement @ 50 Pascals
Specifications
- SF
- MH
- MF
Specification | Objective |
---|---|
Verify that installation area is free of: active water leaks, fuel leaks (i.e., gas, oil, propane), and pest intrusions energized knob and tube wiring uncovered electrical junctions improperly terminated devices (ventilation fans, dryers, plumbing stacks, condensate lines, combustion appliance flues/chimneys, supply and/or return air ducts, etc.) unshielded high-temperature devices (non-IC rated recessed lights, chimneys, flues, vents, etc.) unless they are zero clearance devices insulation escape openings Verify that installation area is: intact, able to support insulation weight, and air sealed |
Ensure space can be safely insulated |
- SF
- MH
- MF
Specification | Objective |
---|---|
Remove any existing insulation or vapor barrier materials from the installation area that are installed improperly |
Prevent condensation |
- SF
- MH
- MF
Specification | Objective |
---|---|
Install batt insulation to prescribed R-value in every joist bay in full contact with the air barrier and all sides of the cavity without gaps, voids, compressions, or misalignments If batt contains a facing material install it in contact with the conditioned space |
Continuous and contiguous thermal boundary |
- SF
- MH
- MF
Specification | Objective |
---|---|
Install an airtight backing material in full contact with the existing cavity insulation Secure backing material using mechanical fasteners that penetrate the sub framing a minimum of 1" Installation must have a minimum of a 30-year service life |
Airtight, durable insulation cavity |
- SF
- MH
- MF
Specification | Objective |
---|---|
Separate all foam products from occupiable space using a thermal barrier material (e.g., 1/2" gypsum wallboard) as specified by applicable building code If code requirements are unclear, consult local code officials for clarification |
Minimize ignition and combustion potential |
- SF
- MH
- MF
Specification | Objective |
---|---|
Post a dated receipt signed by the installer that minimally includes: Installed insulation type, coverage area, installed thickness, and installed R-value |
Comply with 16 CFR 460.17 and document contract compliance |