Continuous, contiguous, and safe thermal boundary
Specifications
- SF
- MF
Specification | Objective |
---|---|
Verify that installation area is free of: active water leaks, fuel leaks (i.e., gas, oil, propane), and pest intrusions energized or undammed knob and tube wiring uncovered electrical junctions improperly terminated devices (ventilation fans, dryers, plumbing stacks, condensate lines, combustion appliance flues/chimneys, etc.) unshielded high-temperature devices (non-IC rated recessed lights, chimneys, flues, vents, etc.) unless they are zero clearance devices insulation escape openings Verify that installation area is: intact, able to support insulation weight, and air sealed Verify all plumbing and ductwork will be inside the thermal boundary Verify that existing floor air barrier is smooth and is not ribbed or fluted metal decking material |
Ensure space can be safely insulated |
- SF
- MF
Specification | Objective |
---|---|
Remove any existing insulation or vapor barrier materials from installation area Install flags that can be seen below the insulation level at any utility junctions that will be covered by insulation |
Prevent condensation, identify utility junctions for future access |
- SF
- MF
Specification | Objective |
---|---|
Install batts over 100% of accessible area to prescribed R-value in full contact with the air barrier and all structural framing without gaps, voids, compressions, or misalignments If vapor retarder facing exists, install it facing the conditioned area |
Continuous and contiguous thermal boundary that prevents excessive vapor intrusion |
- SF
- MF
Specification | Objective |
---|---|
Install a support system for batt insulation that is mechanically fastened to the floor deck and supports the batt insulation without compression and has a minimum service life of 20 years |
Secure batts to floor |
- SF
- MF
Specification | Objective |
---|---|
Post a dated receipt signed by the installer that minimally includes: Installed insulation type, coverage area, installed thickness, and installed R-value |
Comply with 16 CFR 460.17 and document contract compliance |