Continuous, contiguous, safe, and compliant thermal barrier installation that protects integrity of roof
Specifications
- MH
Specification | Objective |
---|---|
Verify that installation area is free of: active water leaks, fuel leaks (i.e., gas, oil, propane), and pest intrusions uncovered electrical junctions improperly terminated devices (ventilation fans, dryers, plumbing stacks, condensate lines, combustion appliance flues/chimneys, etc.) unshielded high-temperature devices (non-IC rated recessed lights, chimneys, flues, vents, etc.) unless they are zero clearance devices insulation escape openings Verify that installation area: is intact, able to support insulation weight, and air sealed |
Ensure space can be safely insulated |
- MH
Specification | Objective |
---|---|
Remove a small section (no more than 10') of fasteners at a time from the J channel and the roof edge on the most easily accessible side of the dwelling and separate roof from the heel plate and siding Prop roof open no more than necessary to accommodate fill tube access to entire cavity Avoid performing this method when high winds are expected |
Create safe access to entire cavity |
- MH
Specification | Objective |
---|---|
Fill entire attic to prescribed R-value If existing insulation is roof-mounted, insulation will be blown below If existing insulation is ceiling-mounted, insulation will be blown above If existing insulation is mounted at both locations, insulation will be blown in between |
Continuous thermal barrier of consistent R-value |
- MH
Specification | Objective |
---|---|
Remove existing sealant from the roof edge and J channel Install new sealant at the original location Install new J channel if existing J channel is damaged Fasten roof and J channel to the original location with new screws Seal all seams, edges, and penetrations of roof/wall connection |
Weathertight roof closure |
- MH
Specification | Objective |
---|---|
Post a dated receipt signed by the installer that minimally includes: Installed insulation type, coverage area, installed thickness, minimum settled thickness, installed R-value, and number of bags installed |
Comply with 16 CFR 460.17 and document contract compliance |